Original Text
                    (Annotation: EPW012016 / 1422045)
				
			
			
                                    						'
                            Harbour railway branch swing bridge opened for vessel entering Floating Harbour at high tide. The tidal Avon and the locks at the Cumberland Basin restricted vessels to less than 330-350 feet in length
						'